Contacto / Contact

GTM PANAMÁ

  • Client: GTM
  • Category: Sistemas
  • Estimated cost: $190 mil.
  • Status: Completed

GTM PANAMA

Project in which class I and III hose cabinets were installed as well as hydrants and water-foam monitors.In addition, a movable foam trolley, fire pumping equipment and bolted steel tank for water storage were supplied and installed.

Project in which class I and III hose cabinets were installed as well as hydrants and water-foam monitors.
In addition, a movable foam trolley, fire pumping equipment and bolted steel tank for water storage were supplied and installed.